In this post we are providing you an overview of Classification of Lightning Protection Systems (LPS). Lightning Protection Systems (LPS) are categorized into four classes (I, II, III, and IV). This classification is based on the level of lightning protection required. These classes are defined in IEC 62305 (Protection Against Lightning). The higher the class…
Category: SEC Projects
Technical Strategies to Improve Transmission Line Efficiency
In modern power systems, the efficiency of transmission lines directly affects overall grid performance, operating costs, and reliability. Since transmission losses primarily occur due to conductor resistance and reactive power flow, engineers must carefully evaluate both design and operational strategies to minimize these losses. Below is a detailed technical review of methods to improve transmission…
TDP Secures 380kV MAWQAQ PV BSP Project in Saudi Arabia (#9057)
TDP Secures 380kV MAWQAQ PV BSP Project in Saudi Arabia (#9057). Earlier in April 2025, TDP submited lowest Bid for this BSP. MAWQAQ PV BSP #9057 is Located in Hail Area of COA. TDP submits lowest Bid of 591.9M SAR. The Client is SEC & the project consists of CONSTRUCTION OF NEW MAWQAQ PV BSP #9057.The Project…
Role of Synchronous Condensers in Modern Power Systems (2025)
As power systems around the world transition to renewable energy sources, grid stability has become one of the biggest challenges. Traditional generators provided inertia, reactive power support, and fault current contribution. With renewables like solar PV and wind (which use power electronics), these services are reduced. That’s where synchronous condensers come into play—an old technology…
SEC Standards Update: New vs Old
Saudi Electricity Company (SEC) has issued new standards that mayl soon replace the old ones. These updated codes are essential for engineers, consultants, and contractors working on substations, OHTL (Overhead Transmission Lines), and power system projects in Saudi Arabia. Key Points to Remember: Our Most Read Posts In the old SEC standards, the first letter…
380kV Gas-Insulated Switchgear (GIS)
In this post we will provide you an overview of 380kV Gas-Insulated Switchgear (GIS). This is our 3rd post that is part of Extra High Voltage EHV Substation Design & 380kV Substation Design. If you are new on our website it is recommended to read first the below Posts What is Switchgear? Switchgear is a general term…
Inside a 380kV BSP: Overall Layout Drawing Explained
In today’s rapidly growing power networks, Bulk Supply Points (BSPs) play a vital role in ensuring reliable electricity transmission and distribution. A BSP is essentially the bridge between high-voltage transmission lines (380kV in Saudi Arabia) and the sub-transmission network (132kV) that feeds urban centers and industrial zones. While single-line diagrams (SLDs) show the electrical connections,…
Power Transformer Testing Overview
In this post we present you Power Transformer Testing Overview as per IS:2026 (Part I). Power transformers are critical components in the electrical power system, and their reliability is ensured through rigorous testing as specified in IS:2026 (Part I) – Power Transformers: General Requirements. These tests are categorized into Type Tests, Routine Tests, and Special…
Al-BABTAIN submits lowest Bid for 380kV AFIF PV-2 BSP #9102
Al-BABTAIN Contracting submits lowest Bid for 380kV AFIF PV-2 BSP #9102. Afif PV-2 BSP is Located in COA. Al-BABTAIN submits lowest Bid of 1175M SAR. The Client is SEC & the project consists of CONSTRUCTION OF NEW 380KV BSP AFIF PV-2 # 9102 AND E EXPANSION AT AR RASS#9095 & MOWAIH#22510The Project schedual is very tough and…
Al Gihaz submits lowest Bid for 380kV AFIF PV-1 BSP #9101
Al Gihaz Contracting Company starts year 2025 with a big win as they submits lowest Bid for 380kV AFIF PV-1 BSP #9101. Afif PV-1 BSP is Located in COA. Al Gihaz submits lowest Bid of 960M SAR. The Client is SEC & the project consists of CONSTRUCTION OF NEW 380KV BSP AFIF PV-1 # 9101…
