21) How many clips are required to construct an eye in a one-half inch wire rope?
- 3 clips with U bolts on the live end
- 4 clips with U bolts on the live end
- 3 clips with U bolt on the dead end
- 4 clips with U bolts on the dead end
22) Class “B” fires involve flammable liquids or gases that could be under pressure. What would give you most concern when selecting a Class “B” fire extinguisher?
- Exposure to electrical equipment
- Depth of flammable liquid
- Location of fire exits
- Type of fire detectors present
23) How long is a work permit usually valid?
- 1 Month
- 1 Week
- 1 Shift
- 1 Day
24) How far apart (maximum) shall access/egress ladders be in excavation?
- 10 ft
- 25 ft
- 50 ft
- 75 ft
25) When transferring an extremely flammable liquid from a 55-gallon drum via a hand pump to a small metal can, which of the following provides the best protection?
- Ground both container
- Bond both container together
- Bond container together and ground each to a separate ground
- Ground one container and then bond them to each other
26) A small mobile crane with rubber tires has struck a power line. What is the proper course of action for the crane operator?
- Jump from the crane and run away
- Stay in the crane until emergency crews arrive
- Have the oiler knock the line from the boom with a wood pole
- Swing the boom until the line breaks
27) When checking the ground on a duplex outlet, which of the following provides the best method?
- Check continuity between the block and white wire
- Check continuity between green wire and the outlet box
- Check continuity between white wire and the outlet box
- Check continuity between green wire and building ground
28) Which of the following is true concerning explosion-proof equipment?
- The explosion will stay inside the container
- Not producing sparks under any condition
- Operating below ignition temperature
- Shutting down in emergency
29) Minimum period of time the appointed “fire watch” remains at the site of HOT work after activity has stopped?
- 10 minutes
- 15 minutes
- 30 minutes
- 60 minutes
30) One purpose of the “Anti Two Block” device on a crane is:
- To determine the weight of the load lifted
- To prevent the blocking block from contacting outrigger floats
- To determine the length of the wire rope extended
- To prevent the overhaul ball from contacting the boom sheaves
Our Most Read Posts
- Inside a 380kV BSP: Overall Layout Drawing Explained
- 380kV Gantries & Gantry Equipment
- List of Contractors who Won Major BSP Projects in 2024 in KSA
- Tower Testing in Power Transmission: A Complete Guide
- Top Electrical Engineering Courses on Coursera
- List of Top Substation contractors in KSA
- Vector Group of Transformers
- Top Excel Functions Every Engineer Should Master