Conceptual bipolar HVDC transmission line with two pole conductor bundles and Saudi desert converter station

Major HVDC Projects in Saudi Arabia (KSA): 2026 Guide to Converter Stations, Transmission Lines & Contractors

Posted on November 26, 2026 by Engr. Hamid Ali

From a 3 GW intercontinental electricity bridge to a 4 GW desert transmission corridor, Saudi Arabia is building a new generation of power highways. This guide examines the major HVDC developments, their technology, converter stations, transmission packages, publicly reported contractors and status. Research cut-off: 26 November 2026.

Saudi Arabia’s major HVDC projects at a glance

ProjectDC voltage / capacityRouteEvidence-based status
Saudi–Egypt±500 kV / 3 GWMadinah–Tabuk–Badr1.5 GW phase 1 energized; full operation not independently confirmed
Yanbu–NIC South±525 kV / 3 GWWestern Saudi Arabia, ~605 km OHTL schemeAwarded; published target 2027
NEOM additional linksUp to 6 GW combinedTwo further linksEarly works and capacity reservation announced
Riyadh PP14–Kudmi500 kV class / 4 GW1,089 kmOHTL contracts awarded
Al-Fadhili GCCIA1.8 GW upgrade ratingBack-to-back, no long DC lineExisting since 2009; upgrade announced
EOA–COA Link 1500 kV class / 3 GWNariyah–Zulff, ~508 kmAward reported April 2026
EOA–COA Link 2500 kV class; MW not verifiedQurayyah-4/Hajer-2–Khari, ~466 kmTender reported; award not verified

The known headline capacities total up to 20.8 GW when the full 9 GW NEOM program is included, excluding Link 2. This is an arithmetic sum of announced link ratings, not installed capacity, new generation or simultaneous transfer capability. The 3 GW Yanbu project is included in the 9 GW program and must not be counted twice.

1. Saudi Arabia–Egypt electricity interconnection

This cross-border link joins the Saudi 60 Hz and Egyptian 50 Hz grids without requiring synchronous AC operation. The 2021 contract announcement established a 3 GW, ±500 kV multi-terminal LCC (line-commutated converter) system. It combines overhead lines with a submarine crossing in the Gulf of Aqaba. Published route lengths differ: Hitachi Energy describes about 1,000 km, while the IEA gives 1,350 km for the wider route. These figures should not be treated as identical measurement boundaries.

Converter terminalAC interfaceInstalled converter rating
Madinah380 kV2 × 1,500 MW
Tabuk380 kV2 × 750 MW
Badr, Egypt500 kV2 × 1,500 MW

Terminal ratings are not additive transfer capacity. The 3 GW network limit and dispatch constraints govern exchanges. Hitachi Energy supplies the core converter technology; Orascom Construction publicly identifies its consortium scope at Badr and Taba. Hyundai E&C identifies its Madinah–Tabuk–Aqaba line work. Other Saudi package allocations in the original draft require independent confirmation before publication.

Status: Saudi Energy’s FY2025 results presentation confirms energization of the 1.5 GW first phase. August 2026 reporting describes ongoing technical trials toward full operation; commercial operation at the full 3 GW rating has not been independently established in this review.

Sources: Hitachi Energy project data | IEA | Saudi Energy FY2025 results | August 2026 trials report | Orascom annual report

2. Yanbu–NEOM Industrial City (NIC South): 3 GW VSC link

The initial NEOM transmission link uses voltage-source converter (VSC) technology at ±525 kV. Both terminals connect to 380 kV AC networks; two 1,500 MW converter units form the 3 GW bipole. Hitachi Energy provides converter engineering, technology and commissioning, while SSEM undertakes AC equipment and construction/installation responsibilities under the consortium arrangement. SEC acts as EPCM partner to ENOWA.

PackagePublicly identified contractorDetails
Converter stationsHitachi Energy / SSEMYCNT and NIC South; SSEM lists SAR 1.49 billion for its project entry
OHTL Portion IHyundai E&C207 km, about 450 towers; USD 145 million; July 2027 target
OHTL Portion IINot independently verifiedOriginal draft allocation not published as confirmed
OHTL Portion IIILarsen & Toubro200 km; SDEC engineering reference PTS-22WM309

Hyundai describes the OHTL scheme as 605 km, whereas the technology supplier describes a wider connection exceeding 650 km. Route definitions differ or may reflect design revisions; no reconciliation is assumed. Hitachi lists 2027 as the commissioning target, not a guarantee.

Sources: ENOWA | Hitachi Energy | SSEM project reference | Hyundai award | SDEC Portion III

3. NEOM’s two additional HVDC links

The 2023 agreements also cover early works and manufacturing capacity reservation for two further systems, each up to 3 GW. Together with Yanbu–NIC, the announced program could reach 9 GW. This is a development plan, not proof that all three projects have full EPC awards or are under construction. Their final routes, schedules and contract values were not verified. CESI also describes owner-engineer services for the Yanbu/NIC South 3 GW scheme; its use of the term Phase II should not be counted as another independent 3 GW link.

Sources: 2023 agreement | CESI

4. Riyadh PP14–Kudmi: a 4 GW domestic power corridor

The project links the Riyadh PP14 generation area with Kudmi in southwestern Saudi Arabia. Hyundai’s November 2024 announcement identifies a 1,089 km, 500 kV-class double-bipolar HVDC line with 4 GW transfer capacity. Such a corridor can strengthen regional power transfers and improve flexibility between geographically separated generation and demand centers.

OHTL contractorPublicly reported scope/value
Hyundai E&C369 km; USD 725 million; January 2027 section target
Larsen & ToubroSAR 1.51 billion contract, reported November 2024
SSEMThird section identified by trade reporting; length/value not verified

The OHTL package targets are not dates for full system commercial operation. Converter OEM, terminal configuration details and converter station awards were not independently verified here.

Sources: Hyundai official announcement | L&T and SSEM trade report

5. Al-Fadhili: the GCC’s asynchronous HVDC bridge

Al-Fadhili is fundamentally different from the long-distance systems. Its rectifier and inverter are located together in a back-to-back station, allowing the Saudi 60 Hz system to exchange power with the GCC 50 Hz network. The facility entered service in 2009. GCCIA and Hitachi Energy announced a control and protection modernization contract in March 2023, with an announced post-upgrade exchange rating of 1,800 MW. The OEM lists 2026 for commissioning of the upgrade; completion was not independently verified.

Source: Hitachi Energy/GCCIA announcement

6. Eastern–Central Operating Area Link 1: Nariyah–Zulff

MEED reported on 20 April 2026 that Alfanar Projects had been selected for a roughly USD 500 million OHTL contract. The proposed 508 km, 500 kV-class HVDC line is rated at 3 GW, connecting Nariyah with Zulff BSP. The report attributes the award to a project source; no direct owner announcement was identified here. Converter suppliers, station awards and commissioning dates remain unverified.

7. Eastern–Central Operating Area Link 2: Qurayyah–Khari

The same MEED report identifies a planned second corridor of approximately 466 km from the Qurayyah-4/Hajer-2 area to Khari Industrial City substation. Bids had reportedly been submitted. No final contractor or MW rating was independently confirmed, and the project is treated as a pipeline item rather than an awarded or operational asset.

Source for both eastern-central developments: MEED, 20 April 2026

8. How HVDC actually works

An AC switchyard feeds converter transformers and power electronic valves. The sending terminal converts AC to DC; overhead conductors or cables transfer energy; the receiving terminal converts it back to AC. Power direction and magnitude are controlled electronically.

Power calculation: for a balanced bipole, P ≈ 2 × Vpole × Idc. A ±525 kV, 3 GW link carries approximately 2,857 A per pole at rated power, ignoring losses. A ±500 kV, 3 GW bipole carries approximately 3,000 A. The pole-to-pole voltage is 1,050 kV and 1,000 kV respectively, not the pole-to-earth voltage.

FeatureLCC HVDCVSC HVDC
Valve technologyThyristorsSelf-commutated semiconductor valves, often MMC
Grid dependencyNormally needs strong AC voltage for commutationCan support weaker grids with suitable controls
Reactive powerTypically substantial filter/compensation needsIndependent P/Q control within capability limits
Power reversalTypically voltage polarity reversal in conventional schemeTypically DC current reversal
Saudi exampleSaudi–EgyptYanbu–NIC

The technology selection depends on grid strength, transmission medium, required control functions, losses, footprint and economics. Black-start capability is design dependent, not automatic for every VSC system.

9. Major equipment and EPC work breakdown

PackageTypical engineering and procurement scope
AC switchyardGIS/AIS, breakers, CTs/VTs, arresters, busbars
Converter transformersInsulation, harmonic duty, cooling, transport and installation
Valve hallsThyristor or MMC valves, cooling, valve control and shielding
DC yardReactors, measuring devices, disconnectors, arresters, DC filters where needed
Transmission linesSurvey, geotechnical investigation, tower design, foundations, conductors, insulators, OPGW
Auxiliary systemsAC/DC supplies, UPS, HVAC, fire protection, water cooling
Control and protectionPole/bipole control, protection, SCADA, telecom, cyber security
TestingFactory tests, subsystem integration, energization and grid performance tests

An HVDC tender should distinguish technology-OEM scope from local EPC scope, OHTL and cable packages, AC grid reinforcement and owner interfaces. Key study deliverables include AC/DC load flow, EMT, insulation coordination, harmonic and resonance assessment, transient overvoltage, grounding and reliability studies.

10. Why Saudi Arabia is investing in HVDC

Long transmission distances, renewable resource geography, interregional exchange and asynchronous international connections make HVDC useful. DC overhead lines avoid AC charging-current and steady-state reactive-power constraints, while DC cables are particularly attractive for long submarine distances. Converter costs and losses mean HVDC is not automatically cheaper or more efficient at every distance. Project-specific economics matter.

11. Related engineering guides

Inside a 380 kV BSP • Substation tendering and contract management • Transmission line efficiency • Grid-forming BESS vs synchronous condensers • Transient recovery voltage

Frequently asked questions

What is the largest announced Saudi domestic HVDC corridor in this guide? Riyadh–Kudmi is rated 4 GW; NEOM’s 9 GW figure describes three links rather than one link.

Can Saudi Arabia and Egypt exchange electricity despite different frequencies? Yes. HVDC decouples the AC frequencies.

Is a 380 kV double-circuit OHTL an HVDC line? Not necessarily. D/C frequently means double circuit in AC project descriptions and should not be confused with direct current.

Are all listed projects operational? No. They include existing assets, awarded projects and planned developments. Always distinguish energization, testing and commercial operation.

Conclusion

Saudi Arabia’s HVDC portfolio spans international exchange, renewable-ready VSC transmission, regional bulk power corridors and asynchronous grid coupling. For engineering professionals, these projects create opportunities in converter technology, AC substations, overhead lines, protection, civil construction and commissioning. This article is based on public sources; unverified package allocations, dates and technical ratings have intentionally been excluded or marked uncertain. The featured illustration is conceptual and does not depict a specific project.

Our Top Posts

  • List of Contractors who Won Major BSP Projects in 2024 in KSA
  • Top Electrical Engineering Courses on Coursera
  • List of Top Substation contractors in KSA
  • Transmission Line Design Important Points
  • Panels required inside substations
  • Electrical MCQs with Explanation of Answers
  • Electrical Past papers
  • How to Add MCQs in wordpress posts
  • Transmission Lines design Basics
  • 380kV Substation Design (23)
  • Al BABTAIN (2)
  • Al Gihaz (4)
  • AL-OJAIMI (2)
  • Alsharif Group (2)
  • Basic Electrical (7)
  • Basic Electronics (5)
  • BSP Projects (23)
  • Communication System (2)
  • Control System (2)
  • Control System MCQs (3)
  • Courses (11)
  • DATA Center (2)
  • electrical (9)
  • Electrical Courses (9)
  • Electrical Installations (4)
  • Electrical Jobs (8)
  • Electrical MCQs (13)
  • Electronics MCQs (9)
  • Energy Storage Systems (3)
  • Extra High Voltage EHV Substation Design (36)
  • Fellowships (3)
  • Fellowships in Pakistan (1)
  • Fellowships in Pakistan (2)
  • FPSC (1)
  • HV Substation Design (2)
  • HVDC Projects (1)
  • Information for Engineers (57)
  • Interview Preparation (47)
  • Jobs (11)
  • Jobs in KSA (11)
  • LV Switchgear (4)
  • MATLAB and Simulink (1)
  • MCQs (15)
  • Microsoft Excel (3)
  • Microwaves MCQs (1)
  • NTS Past Papers (4)
  • OHTL Projects (9)
  • Past Papers (10)
  • Power Transformer (5)
  • Research Work (6)
  • Safety MCQs (2)
  • Saudi ARAMCO (3)
  • Scholarships (4)
  • Scholarships in Pakistan (2)
  • Scholarships in Pakistan (2)
  • SEC Projects (30)
  • SSEM (3)
  • Submarine Cables (1)
  • Synchronous Condensers (5)
  • TDP (2)
  • Transmission lines design (10)
  • Uncategorized (33)
  • Web Development (1)

Latest Posts

  • Major HVDC Projects in Saudi Arabia (KSA): 2026 Guide to Converter Stations, Transmission Lines & Contractors
  • Transient Recovery Voltage: The Hidden Challenge in Circuit Breaker Design
  • Electrical Insulators Explained: Types, Creepage Distance, Mechanical Rating (kN), IEC Standards & 380 kV Design
  • 10 Free Online Course & Certificate Platforms in Saudi Arabia (2026)
  • Submarine Cables Explained: Types, Repeaters, Power Feeding & Cable Landing Stations

All Pages

  • Active Scholarships
  • C++ Data Structures
  • Electrical MCQs with explanation
  • Funny IQ Test – 20 Tricky Questions & Answers | Interactive Challenge
  • Funny IQ Test Part 2 – 20 New Tricky Questions & Answers
  • Jobs
  • Privacy Policy
  • Technical Posts
  • The World of Engineers
  • Top Electrical MCQs with explanation

Follow Us on

  • Facebook
  • YouTube
  • LinkedIn

© 2026 The World of Engineers | Powered by Superbs Personal Blog theme