Skip to content

The World of Engineers

Treasure of Concepts, Latest Jobs and Scholarships

Menu
  • Home
  • Blog
  • MCQs
  • Past Papers
  • Contractors
    • SSEM
    • Al Gihaz
    • substation contractors
    • OHTL Projects
    • SEC Projects
  • Design
    • 380kV Substation Design
    • Extra High Voltage EHV Substation Design
    • Transmission lines design
  • Jobs
    • Electrical Jobs
  • Privacy Policy
Menu

380kV BSP Projects Winners in 2025 in Saudi Arabia

Posted on March 28, 2026March 28, 2026 by Engr. Hamid Ali

Saudi Arabia’s power transmission sector continues to expand rapidly, driven by large-scale PV and wind generation projects and the need for robust 380kV Bulk Supply Points (BSPs). In 2025, a total of 20 major 380kV BSP projects were announced and opened, offering a clear picture of how EPC contracts are distributed among leading contractors. Some of these Tenders are already awarded whereas others are still under evaluation.

This post presents a data-driven analysis of contractor performance, based on Winning of projects, highlighting market leaders, competitive tiers, and emerging patterns in the Saudi extra-high-voltage (EHV) substation landscape.

List of Contractors who Won Major BSP Projects in 2025 in KSA

LARSEN & TOUBRO SAUDI ARABIA LLC

LARSEN & TOUBRO SAUDI ARABIA LLC (L&T) has emerged as a joint market leader in 2025, securing 4 out of 20 awarded 380kV BSP projects, representing a 20% market share. This strong performance highlights L&T’s continued dominance in delivering complex extra-high-voltage (EHV) substation projects across Saudi Arabia.

L&T’s success can be attributed to its:

  • Proven expertise in 380kV EPC turnkey projects
  • Strong execution track record in renewable-linked BSPs (PV & Wind)
  • Capability to handle integrated scope including reactors, expansions, and grid interconnections

With consistent project wins and a solid presence in the Kingdom, L&T remains a key Tier-1 contractor, playing a vital role in supporting Saudi Arabia’s grid expansion and energy transition goals. In following Tenders L&T was the Winner.

  1. RFX # 4000081411 – Construction of Mowaih-2 PV 380kV BSP (WOA) and installation of one 380 kV, 80 MVAR line connected reactor at RBG2 BSP
  2. RFX No. 4000081389 CONSTRUCTION OF A NEW SUBSTATION Haden -2 380/33 KV BSP & Installation 380 kV, 80 MVAR Reactor to BAHA BSP
  3. RFX 4000082706 – CONSTRUCTION OF SADAWI-2 380KV BSP
  4. RFX No. 4000082753- CONSTRUCTION OF NEW 380/33KV AL-LEETH PV BSP

TDP

TDP stands out as a joint market leader in 2025, securing 4 out of 20 awarded 380kV BSP projects, achieving a 20% winning share. This performance underscores TDP’s strong positioning in Saudi Arabia’s extra-high-voltage (EHV) transmission sector, particularly in projects linked to renewable energy integration.

TDP’s success is driven by:

  • Extensive experience in 380kV BSP EPC execution
  • Strong delivery capability for PV and wind interconnection substations
  • Competitive edge in tendering, cost optimization, and project turnaround
  • List of Contractors who Won Major BSP Projects in 2024 in KSA
  • List of Top Substation contractors in KSA
  • Leading OHTL Contractors in KSA

By consistently winning high-value projects, TDP reinforces its reputation as a reliable Tier-1 contractor, playing a critical role in expanding the Kingdom’s power transmission infrastructure and supporting Vision 2030 energy objectives. TDP was successfull in the following Projects.

  1. RFX NO. 4000081317 CONSTRUCTION OF NEW 380KV BSP MAWQAQ PV #9057
  2. RFX 4000081582 CONSTRUCTION OF NEW BAIDA NATHEL WIND 380/132 KV BSP # 9100 AND EXPANSION AT EXISTING AFIF BSP # 9081
  3. RFX : 4000081782–CONSTRUCTION OF NEW SAMHA WIND 380/132KV BSP # 9105
  4. Qira Wind BSP
BSP Projects Winners in 2025

Linxon

Linxon secured 2 out of 20 projects (10%) in 2025, maintaining a solid presence in Saudi Arabia’s 380kV BSP market.
Its consistent wins reflect strong expertise in EHV substation EPC delivery and grid integration projects. Linxon has secured below Two Projects in 2025.

  • RFX 4000081472 – CONSTRUCTION OF NEW 380/33 KV SHEGRAN WIND BSP
  • RFX No. 4000081493 – CONSTRUCTION OF A NEW SUBSTATION FOR SOUTH OLA PV 380/110 KV BSP

Alfanar Projects

Alfanar Projects secured 2 out of 20 projects (10%) in 2025, demonstrating steady participation in Saudi Arabia’s 380kV BSP market.
Its performance highlights growing strength in EHV substation execution and renewable energy–linked infrastructure projects. As usual Alfanar Projects has also secured below Two Projects in 2025.

  • RFX. 4000081363 : CONSTRUCTION OF A NEW SUBSTATION KHR-1 380/110 KVBSP & EXPANSION OF EXISTING MHR BSP UNDER RENEWABLE ENERGY POWER PLANT(WOA)
  • RFX No. 4000082742- CONSTRUCTION OF A NEW SUBSTATION HENAKIYAH-3 PV 380KV BSP UNDER RENEWABLE ENERGY POWER PLANT (WOA)

AL Gihaz

AL Gihaz secured 2 out of 20 projects (10%) in 2025, demonstrating a strong and competitive presence in Saudi Arabia’s 380kV BSP market.
Its performance reflects solid capability in delivering EHV substation projects and expanding its footprint in renewable energy–driven grid infrastructure. Al Gihaz won following new BSPs in 2025

  • RFX No. 4000082926- Construction of a New substation for Tathleeth-PV 380/33KV BSP (SOA)
  • RFX No. 4000081271 CONSTRUCTION OF NEW 380KV BSP AFIF PV-1 # 9101 AND EXPANSION OF DAWADMI 380KV BSP #9037

TBEA Co Ltd

TBEA Co Ltd secured 2 out of 20 projects (10%) in 2025, marking a notable entry and growing presence in Saudi Arabia’s 380kV BSP market.
TBEA’s first EPC substation project secured in the Saudi market, the Namria BSP represents a major milestone as the first SF₆-free GIS substation in the Kingdom, supporting sustainable energy infrastructure and environmental responsibility. TBEA as entered in KSA Markete won below Two Projects

  • RFx 4000081773 :CONSTRUCTION OF NEW NAMRIA WIND 380/132 KV BSP
  • RFX 4000081776 – CONSTRUCTION OF NEW TAWILAH WIND 380/132KV BSP # 9106

Al Ojaimi, Al-BABTAIN & Alsharif KEC

Al Ojaimi, Al-BABTAIN & Alsharif KEC each secured 1 out of 20 projects (5%) in 2025, maintaining a selective presence in Saudi Arabia’s 380kV BSP market.
Its participation reflects targeted engagement in EHV substation projects with steady execution capability. following projects won by each of these contractors.

RFX-4000081263 CONSTRUCTION OF NEW 380KV BSP AFIF PV-2 9102 & EXPANSION AT AR RASS 9095 by Al-BABTAIN

RFx 4000081371 – CONSTRUCTION OF A NEW SUBSTATION KHR-2 380/110 KV BSP UNDER RENEWABLE ENERGY by Al Ojaimi

RFX No. 4000081332 CONSTRUCTION OF NEW 380/33 KV BILGHAH WIND BSP by AS KEC

ContractorProjects WonWinning Percentage
TDP420%
L&T420%
Alsharif KEC210%
AL Gihaz210%
Linxon210%
TBEA Co Ltd210%
Alfanar Projects210%
Al Ojaimi15%
Al-BABTAIN15%

«Previous Post

Our Top Posts

  • List of Contractors who Won Major BSP Projects in 2024 in KSA
  • Top Electrical Engineering Courses on Coursera
  • List of Top Substation contractors in KSA
  • Transmission Line Design Important Points
  • Panels required inside substations
  • Electrical MCQs with Explanation of Answers
  • Electrical Past papers
  • How to Add MCQs in wordpress posts
  • Transmission Lines design Basics
  • 380kV Substation Design (18)
  • Al BABTAIN (2)
  • Al Gihaz (4)
  • AL-OJAIMI (2)
  • Alsharif Group (2)
  • Basic Electrical (7)
  • Basic Electronics (5)
  • BSP Projects (18)
  • Communication System (2)
  • Control System (2)
  • Control System MCQs (3)
  • Courses (7)
  • DATA Center (1)
  • electrical (8)
  • Electrical Courses (6)
  • Electrical Jobs (7)
  • Electrical MCQs (12)
  • Electronics MCQs (9)
  • Extra High Voltage EHV Substation Design (20)
  • Fellowships (2)
  • Fellowships in Pakistan (1)
  • FPSC (1)
  • HVDC Projects (1)
  • Information for Engineers (40)
  • Interview Preparation (30)
  • Jobs (10)
  • Jobs in KSA (11)
  • MATLAB and Simulink (1)
  • MCQs (13)
  • Microsoft Excel (2)
  • Microwaves MCQs (1)
  • NTS Past Papers (4)
  • OHTL Projects (7)
  • Past Papers (10)
  • Research Work (4)
  • Safety MCQs (2)
  • Saudi ARAMCO (3)
  • Scholarships (3)
  • Scholarships in Pakistan (1)
  • Scholarships in Pakistan (1)
  • SEC Projects (22)
  • SSEM (3)
  • Synchronous Condensers (2)
  • TDP (2)
  • Transmission lines design (7)
  • Uncategorized (25)
  • Web Development (1)

Latest Posts

  • 380kV BSP Projects Winners in 2025 in Saudi Arabia
  • The Electrical Power System in Data Centers
  • Protection Signaling (PSE) Migration: Digital to Optical Ethernet over MPLS
  • Autotransformers in EHV Power Systems: Theory, Maths & Practice
  • Auxiliary Transformer Sizing (Substation Primary Design Course)

All Pages

  • Active Scholarships
  • C++ Data Structures
  • Electrical MCQs with explanation
  • Jobs
  • Privacy Policy
  • Technical Posts
  • The World of Engineers
  • Top Electrical MCQs with explanation

Follow Us on

  • Facebook
  • YouTube
  • LinkedIn

© 2026 The World of Engineers | Powered by Superbs Personal Blog theme