Skip to content

The World of Engineers

Treasure of Concepts, Latest Jobs and Scholarships

Menu
  • Home
  • Blog
  • MCQs
  • Past Papers
  • Contractors
    • SSEM
    • Al Gihaz
    • substation contractors
    • OHTL Projects
    • SEC Projects
  • Design
    • 380kV Substation Design
    • Extra High Voltage EHV Substation Design
    • Transmission lines design
  • Jobs
    • Electrical Jobs
  • Privacy Policy
Menu

SEC invited Bids for Synchronous Condenser Plants Phase II

Posted on October 30, 2024October 30, 2024 by Engr. Hamid Ali

SEC invited Bids for Synchronous Condenser Plants Phase II in KSA. Theses are the first of their kind in Kingdom, as Synchronous Condenser Plants were never installed before in the Kingdom.

These projects involve the development of a cutting-edge synchronous condenser plants. The work scope includes the design, manufacturing, and installation of a fully operational synchronous condenser plant. Along with all necessary auxiliary equipment, at multiple locations.  This plant will connect to the existing 380 kV GIS substations and will encompass all essential interfaces, such as civil, electrical, mechanical, control and protection, and telecommunications, to ensure proper integration.

Synchronous Condenser Plants Phase II

The total amount of 3450 MVA synchronous condensers ( SCs ) equipment’s at six (6) 380 kV substations in COA, WOA, EOA & SOA as described in below.

The installation of synchronous condenser to improve the voltage profile, frequency fluctuation support, system inertia and short circuit power. And further to enhance the system stability and reliability of KSA Power System. This is required for adequately integration of renewable energy sources (RES) integration to the Saudi Grid. Click here for details about Challenges in Renewable-Dominated Grids & Role of Synchronous Condensers

RFX. NoProject Name Location Capacity (MVAr)
4000079742DAWADMI WIND BSP#9096-COADawadmi Wind400
4000079743STARAH WIND BSP#9085-COAStarah Wind400
4000079736NAJRAN PV BSP-SOANajran PV650
4000079718BISHA PV BSP-SOABisha PV500
4000079724HUMAIJ PV BSP-WOAHumaij PV1000
4000079735SADAWI PV BSP-EOASadawi PV500
Synchronous Condenser plants phase II details

Related posts you may like

  • Top Electrical Engineering Courses on Coursera
  • List of Top Substation contractors in KSA
  • Transmission Line Design Important Points
  • Panels required inside substations
  • Electrical MCQs with Explanation of Answers
  • Electrical Past papers
  • How to Add MCQs in wordpress posts
  • Transmission Lines design Basics
  • Transmission Lines Design par 1: Tower weights manually using filters
  • Transmission Lines Design par 2: Auto calculation of Tower Weights

«Previous Post
Next Post»

Our Top Posts

  • List of Contractors who Won Major BSP Projects in 2024 in KSA
  • Top Electrical Engineering Courses on Coursera
  • List of Top Substation contractors in KSA
  • Transmission Line Design Important Points
  • Panels required inside substations
  • Electrical MCQs with Explanation of Answers
  • Electrical Past papers
  • How to Add MCQs in wordpress posts
  • Transmission Lines design Basics
  • 380kV Substation Design (18)
  • Al BABTAIN (1)
  • Al Gihaz (3)
  • AL-OJAIMI (1)
  • Alsharif Group (1)
  • Basic Electrical (7)
  • Basic Electronics (5)
  • BSP Projects (17)
  • Communication System (1)
  • Control System (2)
  • Control System MCQs (3)
  • Courses (6)
  • electrical (8)
  • Electrical Courses (6)
  • Electrical Jobs (7)
  • Electrical MCQs (12)
  • Electronics MCQs (9)
  • Extra High Voltage EHV Substation Design (19)
  • Fellowships (2)
  • Fellowships in Pakistan (1)
  • FPSC (1)
  • HVDC Projects (1)
  • Information for Engineers (38)
  • Interview Preparation (28)
  • Jobs (10)
  • Jobs in KSA (11)
  • MATLAB and Simulink (1)
  • MCQs (13)
  • Microsoft Excel (2)
  • Microwaves MCQs (1)
  • NTS Past Papers (4)
  • OHTL Projects (7)
  • Past Papers (10)
  • Research Work (4)
  • Safety MCQs (2)
  • Saudi ARAMCO (3)
  • Scholarships (3)
  • Scholarships in Pakistan (1)
  • Scholarships in Pakistan (1)
  • SEC Projects (20)
  • SSEM (2)
  • Synchronous Condensers (2)
  • TDP (1)
  • Transmission lines design (7)
  • Uncategorized (24)
  • Web Development (1)

Latest Posts

  • Autotransformers in EHV Power Systems: Theory, Maths & Practice
  • Auxiliary Transformer Sizing (Substation Primary Design Course)
  • The Rise of SF6-Free Switchgear: Alternatives, Advantages, and the Road Ahead
  • Safety Assessment at Saudi Aramco Part 3
  • Classification of Lightning Protection Systems

All Pages

  • Active Scholarships
  • C++ Data Structures
  • Electrical MCQs with explanation
  • Jobs
  • Privacy Policy
  • Technical Posts
  • The World of Engineers
  • Top Electrical MCQs with explanation

Follow Us on

  • Facebook
  • YouTube
  • LinkedIn

© 2026 The World of Engineers | Powered by Superbs Personal Blog theme